completions

Error message

  • Warning: mysqli_connect(): php_network_getaddresses: getaddrinfo failed: Name or service not known in include() (line 248 of /var/www/www.monocodebase.com/htdocs/sites/default/settings/www.arabianoilandgas.com.settings.php).
  • Warning: mysqli_connect(): (HY000/2002): php_network_getaddresses: getaddrinfo failed: Name or service not known in include() (line 248 of /var/www/www.monocodebase.com/htdocs/sites/default/settings/www.arabianoilandgas.com.settings.php).
  • Warning: mysqli_close() expects parameter 1 to be mysqli, boolean given in include() (line 272 of /var/www/www.monocodebase.com/htdocs/sites/default/settings/www.arabianoilandgas.com.settings.php).
Tendeka awarded five-year contract extension with Oman operator
The multi-million-dollar contract extends a long-term partnership originally established in 2002
Weatherford's automated connection integrity tool Vero completes 50 runs
The technology has completed 15,000 tubular connections in 50 operations since its .....
Tendeka undertakes field trial with North Sea operator
Scottish firm’s downhole wireless solution installed and tested as an inert safety .....
Tendeka appoints new CEO to boost growth
Brad Baker joins Tendeka after a 27-year career with Baker Hughes, most .....
South Pars phases 15 and 16 near completion
Work set to be fully completed by the end of June
Iran key gas field project nears completion
Operations of 13 wells in Kish gas field launched
Baker Hughes launches new long string technology
Electronically actuated casing packer, cement head top drive unveiled

Most Popular

Digital Edition

Oil & Gas Middle East - September 2020

Subscribe Now